Intake piping nearly done, just waiting on some 90 degree bends.
Thanks guys.
Garage is clean cause it only went up last week
Cost:
$4200 for the slab
$1200 to put the garage up
$6000 for the garage
$1500 in bond and council fees
Plumbing and wiring still yet to be done
The track bus -> http://www.ae86drivingclub.com.au/fo...ead.php?t=2725
Intake piping nearly done, just waiting on some 90 degree bends.
The track bus -> http://www.ae86drivingclub.com.au/fo...ead.php?t=2725
Bends arrived and intake piping is done.
Just needs a quick going over then i can get it tuned
The track bus -> http://www.ae86drivingclub.com.au/fo...ead.php?t=2725
very nice man
I forget exactly
I think i liked the challenge of taking an old engine and converting it with newer technology.
That and the extra .2 litres.
The track bus -> http://www.ae86drivingclub.com.au/fo...ead.php?t=2725
very tidy.
Such a clean build, great job mate
Alright need a list of things to do before getting it tuned:
After tune:
I think that's all for now.
Last edited by pope; 16th January 2011 at 11:12 AM.