Page 3 of 7 FirstFirst 1 2 3 4 5 6 7 LastLast
Results 21 to 30 of 61

Thread: Betty Crocker

  1. #21
    Veteran lolwat's Avatar
    Join Date
    Oct 2009
    Name
    Michael
    State
    NSW
    Location
    Crimebrook 2749
    Country
    Australia
    Posts
    3,971

    Default

    going with little mike this sunday to get it

  2. #22
    Veteran lolwat's Avatar
    Join Date
    Oct 2009
    Name
    Michael
    State
    NSW
    Location
    Crimebrook 2749
    Country
    Australia
    Posts
    3,971

    Default

    pics will be soon
    Got engine
    started making frame for fuel cell
    Magic man Lower control arms and caster rods
    Dash has been gutted completely

  3. #23
    Veteran drift kid's Avatar
    Join Date
    Dec 2008
    Name
    Ben
    State
    NSW
    Location
    Glossodia
    Country
    Australia
    Posts
    2,902

    Default

    just because this peasant never updates, I made the rear equal length trailing arm boxes and we cleaned out the back of the ke plus marked it all out ready for cutting, 40*+ temps slowed the progress stupid fast lol


  4. #24
    Veteran lolwat's Avatar
    Join Date
    Oct 2009
    Name
    Michael
    State
    NSW
    Location
    Crimebrook 2749
    Country
    Australia
    Posts
    3,971

    Default

    bam!

  5. #25
    Senior Member lappy's Avatar
    Join Date
    Dec 2008
    Name
    Brenton
    State
    WA
    Location
    Eaton
    Country
    Australia
    Posts
    221

    Default

    Good work! What is the thickness of the steel you used for the box sections? I'm planning to to the same

  6. #26
    Senior Member Sprinter Freak's Avatar
    Join Date
    Jun 2010
    Name
    ryan
    State
    NSW
    Location
    Sydney
    Country
    Australia
    Posts
    600

    Default

    box sections are looking good man. needs more tubs all round tho

  7. #27
    Veteran lolwat's Avatar
    Join Date
    Oct 2009
    Name
    Michael
    State
    NSW
    Location
    Crimebrook 2749
    Country
    Australia
    Posts
    3,971

    Default

    2mm plate, i believe
    got to clean up underneath as benny smashed the other box () last night, looks fuckin awesome, just rear tunnel area to do now, need to shorten panhard rod mount on my diff as its made for watts link, add a bar so i can have 2-3 panhard bar mounts/levels(if clay comments saying half assing not going watts link, ill bite your face off), weld on spring perches, powder coat, get new crown and pinion setup and thats diff done
    chiseling sound deadner out, isnt as mad as people make it out to be, do a little bit in between things its not too bad

    fronts yes rears no

  8. #28
    Veteran lolwat's Avatar
    Join Date
    Oct 2009
    Name
    Michael
    State
    NSW
    Location
    Crimebrook 2749
    Country
    Australia
    Posts
    3,971

    Default

    both rear boxes are done, rear tunnel is done, now have a diff center that has been welded to the fucking shit house, cut off watts link mount and shortened the other one, ready to weld on 10mm stainless plate so i can have panhard at different heights, spring perches have been welded on, so diff is nearly done ready for sandblast and powder coating

    bought a 3m speedglass 100 series helmet, so i can get cracking on welder as there wasn't one at my factory

  9. #29
    Gunner
    Guest

    Default

    i think you ####s need to start working on the ej86. seriously good effort dude get more pics up you slut

  10. #30
    Veteran lolwat's Avatar
    Join Date
    Oct 2009
    Name
    Michael
    State
    NSW
    Location
    Crimebrook 2749
    Country
    Australia
    Posts
    3,971

    Default

    Benny has pumped work, ive been a bit lazy, did a bit on the welder today, pretty happy wth my self(jumped in the deep end a bit welded spring perches on), so ill get smashing every seam with wire wheel, and seam welding it all

    once diff is in(rolling again) going to flat tow/push, it around to bennys work, so he can make a lovely alum frame and jacking point in the back, then i can start fuel setup, waiting on invoice from bills auto fab as well so i can pay the mofo hahahah


    hurry up #### hahahahah, ill beat you
    Last edited by lolwat; 22nd December 2012 at 08:12 PM.

Page 3 of 7 FirstFirst 1 2 3 4 5 6 7 LastLast

Similar Threads

  1. Betty - new pics and video page 5
    By Blood Child in forum AE86 Owners Forums
    Replies: 103
    Last Post: 4th December 2007, 02:16 AM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •