Update time.

Last year got my time down to a low 62 so this year will hopefully see 61 around the QR sprint track. In the time being just have been doing little jobs that have annoyed me for a while.

This is what the engine bay use to look like:


So stripped the front to clean up the wiring:


Which extended into the interior:


Ended up like this:


Then painted the rocket cover:


Starting to look better:


Wasn't happy with the thermostat just hanging by the hoses:


So made up some brackets to bolt it to the block and some new hoses:


Moved the battery to its new temporary/permanent location:


Added a point in the engine bay to connect it all. (Not 100% happy with this yet)


Also included an isolation switch:


Lastly replaced the ICV with a manually adjustable valve:


Just need to give the engine bay and filters a clean up now. Would like to make the positive connection in the engine bay look a bit neater as well.