i dont have any at the moment, wish i could just walk outside and take some.
the middle bar mounts to the floor bolts go through and there is a plate on the other side.
rearward bars mount to middle with the tube over bar male female style with a bolt through the middle. proceeding to the parcel shelf and under the parcel shelf in the boot two bars go down and bolt to the floor like the front ones do. 16 holes to drill, and some modifying of the parcel shelf will be required.