My breakdown of stuff:
1) Mounting of AW11 seats, and bolting them in.
Probably 1.5hrs. AW11 seats almost line up, would just need to drill out the stock mounting holes and use a good sized washer. Probably not even on all the mounting holes, only two on each seat.
2) Reinstallation of dash (now with fibreglass skin), and installation of instruments, and some trim related. Included is installation of Greddy Profec II EBC and Greddy Intelligent turbo timer. Wiring is mostly done for the EBC.
Wiring isn't really a problem, the turbo timer is very easy to install. I would allow 5 hours for this, to mount the Greddy stuff properly, and put all the other shit back in.
3) Wrap up and neaten wiring in engine bay (from fresh Microtech install)
Loom is all connected, all you need to do is wrap tape around it, and maybe some split corregated hose to protect it a bit more. Maybe an hour and a half to be generous.
4) Putting all door rubbers, etc, back on.
Assuming you can find it all, and know where it all goes, probably an hour.
5) Fitting Door/Hatch handles/locks.
As above?
6) Apply bodykit (already painted, needs fitting).
No idea. All pre-owned kit pieces that had been fitted to cars previously, so should line up very close if not spot on.
7) Hook up and secure vacuum lines.
Bugger all time. 30 mins?
8) Other little misc bits and pieces.
NFI. Maybe throw in 2 hours for this? I'm sure I've forgotten parts...
9) Double check the whole car and make sure everything looks good.
Couple of hours.
10) Drop box, replace shifter housing, replace clutch/flywheel bolts.
3 hours.
11) Fill and bleed clutch and brakes.
1.5 hours.
12) Wrap screamer pipe with exhaust wrap.
1.5 hours (it's a bastard of a fit, but doable).
13) Place heatshield over brake lines in key areas.
30 minutes.
That comes to... 23 hours by my guess? 3 full days work, to get the majority of it done I reckon. The main thing is that someone who has done full project cars before needs to look at it and go over it, and write down exactly what still needs to be done to get it to a stage I'm happy with (another area of needed consultation).